← All Projects
BESS INSTALLATION

Second-Life BESS — Industrial Client

📅 April 2026 📍 Bangkok Metropolitan Area

Installation of a 35 kW three-phase Battery Energy Storage System using second-life LFP battery packs. Integrated with the client's existing solar setup and connected to our Smart Energy AI Platform for peak shaving and real-time monitoring.